  • Project: 12 Storey, 41-Unit Student Residence 100,000 sq. ft.

    Located: 167 King St. N., Waterloo, ON

    167 King St.
     
  • Project: ICF six storey student residence

    Located: Marshall Street, Waterloo

    Size: 38,000 sq ft

    Other projects we are currently building

    ICF Marshall Street Student Housing
     

  • Where: Doon Valley Drive, Kitchener

    Project Scope:  New Construction, 3,100 sq ft

    Conestoga EMS
     

  • Project: General Services Complex Building at University of Waterloo

    Scope: 2nd Floor Elevator and Lobby addition. Project uses helical piers that eliminate the need for underpinning and shoring the existing building
      

    University of Waterloo Addition
     
  • Project: Koinonia Christian Fellowship Addition
    Description:  Addition of School facility
    Size: 3,046 sq meters
    Role: Construction Management

    This project won the prestigious Award of Merit at the GVCA Building Excellence Construction Awards in April 2010.
    Koinonia Christian Fellowship Addition
     

    Project: Supportive Housing of Waterloo

    Description: 30-unit, 5-storey apartment 23, 250 sq ft
    Address: 326 Erb Street, Waterloo, ON
    • This is an ICF, insulated concrete form project. Protrend Arrow Construction has an ICF and Concrete division that specializes in multi-storey ICF projects for residential, commercial, institutional, industrial and resort projects.

     

    Supportive Housing of Waterloo ICF Construction
     


    PROJECT: 311-321 Lester Street,  Waterloo

    ROLE: Project Manager

    DESCRIPTION:This 7-storey student residence (70,000 sq ft) features ICF construction. The Lester Street Lofts brings a lavish twist on student living. From the open-concept floor plans to the sleek, urban finishes, these units exude a new, luxury-type feel unseen in student accommodation in Waterloo so far.
    This ICF project is an exceptional example of Protrend Arrow's ICF capabilities. The entire project was delivered in record time and featured collaborative teamwork between Protrend Arrow's specialized ICF and Concrete divisions. A residential building, this ICF project is more comfortable, more energy efficient, quieter and stronger than any other high quality building. ICF is the "difference maker" in construction and Protrend Arrow are ICF specialists.
    • STOREYS 7, UNITS 36, SUITE MIX 36 – five bedrooms, BEDROOMS 180
    • BUILT 2010
    • STRUCTURE I.C.F. Insulated Concrete Forms
    • EXTERIOR WALLS Stone & stucco
    Protrend Arrow is the ICF Specialist
    icf lester ICF moving
    ICF Worker
    Protrend Arrow Construction are ICF SPECIALISTS, ICF CONSTRUCTORS, ICF EXPERTS, ICF  BUILDERS
    Lester Lofts ICF Construction
     

    Project: Spruce Lodge. 639 West Gore Street, Stratford
    Description:  4-storey Retirement Complex Addition
    Size:  43,000 sq ft
    Role: Construction Management
    Completed: December 2009
    Spruce Lodge
     

    Project: Interior Renovation old Lang Tannery
    Size: 24,000 sq ft
    Role: Construction Management
    Completed: April 2010

    Kitchener Downtown Community Health Centre
     

    Project: Parkwood Mennonite Home, 726 New Hampshire Street, Waterloo
    Description:  Multi- storey Senior's Apartment and Assisted Living
    Size: 91,000 sq ft
    Role: Construction Management
    Parkwood Mennonite Home
     

    Project: The Rockway Gardens Village
    Role: Project Managers
    Description:38 one-bedroom, 12 two-bedroom units
    Address: 1420 King Street East, Kitchener
    Owners: MennoHomes Inc.
    Start:  May 2006 End: March 2007

    Rockway Gardens Village
     

    PROJECT:
    32 University Avenue, Waterloo
    ROLE: Project Manager
    DESCRIPTION: In 2004, we were once again retained as Project Manager by Waterloo Living 2
    for the construction of a new 8 level, 52,000 sq. ft.,140 bed student residences.
    Project duration was 32 weeks. The project was completed in August 2005.
    32 University Avenue, Waterloo
     

    PROJECT:
    60 University, student residence, Waterloo
    DESCRIPTION:
    5 Level, 15,000 square foot student residence.
    Constructed in 21 weeks, with a total of 50 beds
    60 University Avenue
     

    PROJECT:
    Conrad Grebel College, Waterloo, Phases II & III
    DESCRIPTION:
    In 2001, retained as Project Managers by Conrad Grebel University College for the construction of a new Student Apartment Building, expansion of the existing Residence, and the construction of a new Atrium that connected the existingAdministration building to the existing Residence building. Our role as ProjectManagers also included assisting the owners in the selection of the Design and Engineering consultants. The total project was completed in 2003.
    Conrad Grebel College - University of Waterloo
     

    [DcYLyj3UPROFILE]

    PROJECT:
    Seven Duplex Cottages
    Fairview Mennonite Homes, Cambridge
    ROLE: General Contractor
    DESCRIPTION:
    These 7 duplex unit cottages were built on the site of the current Nursing Home and Seniors Apartment Complex, offering total independent living in a Health Care environment. We were selected as the General Contractor through an invited bidder tendering process. The project was completed in 1995.
    Fairview Retirement Community
     

    Project:    Christian Fellowship Church, Waterloo
    Description:    In the role of Project Managers, our firm provided Site Supervision and Project Administration to coordinate and oversee construction of a new church facility in 1989.
    Christian Fellowship Church
     

    PROJECT:
    Ambulance Centre, Milverton, Ontario
    ROLE: Construction Managers
    DESCRIPTION:
    This is a design build project located on the outskirts of Milverton. Designed for
    24 hour operation. This facility has 2000 sq ft of office area with a two bay drive
    through garage covering 1200 sq ft. 
    This project was completed spring of 2005.
    Perth Ambulance Centre
     

    PROJECT:
    Addition & Renovation to Hope Manor
    R.R. #2, Petersburg
    TOTAL PROJECT VALUE:
    $ 1,800,000
    DESCRIPTION:
    Hope Manor, a security and rehabilitation facility for delinquent youth was
    constructed in 1997. This project involved the demolition of the former bedroom
    wing and the construction of a new two storey bedroom wing, new kitchen, dining
    facilities, lounge and staff rooms. A separate gym building was enlarged to include
    extended play area, change rooms and washrooms. Further renovations to the
    existing building completed the project in 1998.

     

    Hope Manor
     

    PROJECT:
    Seven Duplex Cottages
    Fairview Mennonite Homes, Cambridge
    ROLE: General Contractor
    DESCRIPTION:
    These 7 duplex unit cottages were built on the site of the current Nursing Home and Seniors Apartment Complex, offering total independent living in a Health Care environment. We were selected as the General Contractor through an invited bidder tendering process. The project was completed in 1995.
    Fairview Retirement Community
     

     

     

     

     

    Copyright Protrend Arrow Construction Inc. 2012.
    Designed by W4R.
    Home   |   Terms   |   Privacy   |   Contact Us